Installing a wood floor is advisable that must be installed by an expert wood floor contractor. One error and the wood floor may require replacement in a few years, rather than a long life period of 100 years.

The materials and equipment that is needed are the laminate flooring, transition fitting, carpet pad, roofing felt, scissors, finish nailer, knee pads, tape measure, including a rubber mallet. 2 days before installation of the flooring surfaces, unpack it and lay it away flat on the floor so that it can turn into accustomed to the home's humidity. This is going to lessen buckling of the wood after the floor is applied.

Measure the room that the wood flooring will be installed in, add on 10%to 15% for errors that may occur when cutting the flooring or perhaps replacement later on.

Take a look at the sub floor; you must remove any flooring or carpet that is in the installation space along with the base boards. Ensure that the floor is clean, and place the vapor barrier with an overlap of three inches. Apply tar paper or felt as the vapor barrier. The used flooring material will need to be hauled to the dump, and most waste refuges cost a fee for the use of their services. Keep in mind that if you install the floors your knees, back, neck and shoulders will probably be painful.

If the flooring surface was installed by an expert wood floor installation business, they would clean up all of the old flooring or carpet in a short amount of time. The company would additionally dispose of the old supplies. This would help you save the refuge service fee.

Mark exactly where the floor joists are and begin the installation. Snap a chalk line ¾" from the wall surface, this enables for the floor to move and expand with the moisture. Align the edge of the board with the chalk line, and then screw the boards down through the board and into the sub-floor and floor joist. Follow this method until the first row is finished. Ensure that you lay the first boards at a 90 degree angle to the floor joist which is beneath it. Screw the boards down until there can be enough clearance for the nail gun. Make use of a screw for every 10" of flooring.

Continue on this process until you reach the last row. Be certain to make sure that both the ends match perfectly. This can make the floor smooth along with the use of less filler.



The last row is going to be narrower, and the board will have to be trimmed to fit. Measure the area and then trim the board to fit. Fill up any of the openings with wood putty. Fill up the hole and wipe off the excess.

For more information visit our website: http://www.woodfloorplanetnj.com/